Twenty-five sites. Built.
Every contract written and built by BARformula.
A note on what "built" means.
Construction completed under contract.
Every site listed above was designed, financed, and constructed by BARformula. Each was handed over to its plantation owner under contract terms. We do not claim ongoing operational status across the full set — operating arrangements vary by mill, contract term, and current renewal status.
Sites 024 and 025 are the most recent builds, both completed in Q1 2026. Sites 022 and 023 were built in 2024 and 2025 respectively. The Lumadan, Sabah site (023) is the AMR Gen 3 reference deployment running in parallel with a legacy compost system as a measured baseline comparator.
For specific operational, performance, or carbon-evidence detail on any site listed, contact BARformula leadership directly.