Track record · 2008–2026

Twenty-five sites. Built.

Every contract written and built by BARformula.

0
Sites built
0
Plantation groups served
3
Geographies · MY · ID · PNG
0M tonnes
Biomass converted to Matrix

SITE BUILT PLANTATION GROUP LOCATION COUNTRY SUB-REGION STATUS
0012009Kencana Agri LtdPT Alamraya Kencana MasIDSumateraBuilt
0022009REA Holdings plcPT Sasana Yudha BhaktiIDEast KalimantanBuilt
0032009REA Holdings plcPT Cipta Davia MandiriIDEast KalimantanBuilt
0042009WTK · Southwind PlantationsSouthwind EstateMYSarawakBuilt
0052010PT Bakrie Sumatera PlantationsSumatera SouthIDSumateraBuilt
0062010PT Bakrie Sumatera PlantationsSumatera NorthIDSumateraBuilt
0072011MP Evans plcBertam EstateIDSumateraBuilt
0082011MP Evans plcEast Kalimantan EstateIDEast KalimantanBuilt
0092012Genting PlantationsPT Dwie Warna KaryaIDCentral KalimantanBuilt
0102013Genting PlantationsSandakan EstateMYSabahBuilt
0112014ANJ Group · AustindoPT Austindo Nusantara Jaya AgriIDSumateraBuilt
0122015ANJ Group · AustindoPT Sahabat Mewah & MakmurIDBelitungBuilt
0132017United Malacca BhdBukit Senorang MillMYPahangBuilt
0142018United Malacca BhdSabah EstateMYSabahBuilt
0152019PT Tunas Prima SejahteraTPS · Low Yat GroupIDEast KalimantanBuilt
0162019Julong Tianjin GroupPT Wahana Plantation & ProductIDWest KalimantanBuilt
0172020Genting PlantationsPT Sepanjang Inti Surya UtamaIDCentral KalimantanBuilt
0182021MP Evans plcPT Karya Kemilau CemerlangIDEast KalimantanBuilt
0192022REA Holdings plcREA Kaltim · Phase 2IDEast KalimantanBuilt
0202023ANJ Group · AustindoPT Austindo Aufwind New EnergyIDSumateraBuilt
0212023PT Bakrie Sumatera PlantationsNorth Sumatera MillIDSumateraBuilt
0222024Genting PlantationsPT Permata Sawit MandiriIDWest KalimantanBuilt
0232025PT BPP AgrariaLumadan AMR Gen 3 reference siteMYSabahBuilt
0242026 Q1Sawit KinabaluSabah State estateMYSabahNew
0252026 Q1KorindoPT Berkat Cipta AbadiPNGWest Papua / PNGNew

Note

A note on what "built" means.

Construction completed under contract.

Every site listed above was designed, financed, and constructed by BARformula. Each was handed over to its plantation owner under contract terms. We do not claim ongoing operational status across the full set — operating arrangements vary by mill, contract term, and current renewal status.

Sites 024 and 025 are the most recent builds, both completed in Q1 2026. Sites 022 and 023 were built in 2024 and 2025 respectively. The Lumadan, Sabah site (023) is the AMR Gen 3 reference deployment running in parallel with a legacy compost system as a measured baseline comparator.

For specific operational, performance, or carbon-evidence detail on any site listed, contact BARformula leadership directly.